top of page
Home
Services
Fix IT
Finance
Licencing Hub
Offers
M365 Business Premium
CodeTwo Signatures 365
AvePoint 365 Cloud Backup
About Us
Contact
More
Use tab to navigate through the menu items.
020 3011 0915
MON-FRI 9am-6pm
Get Quote
< Back
Seamless Wireless AV Install
The Challenge The Midlands based client required a complete upgrade of their meeting room and open-plan office technology to support modern hybrid working. Key requirements included rock-solid wireless coverage, wall-mounted large-screen TVs with clean connectivity to under-desk floor boxes, and additional power provision – all while minimising disruption to a busy working environment. Specific needs: • Reliable Wi-Fi coverage via 4 new enterprise-grade wireless access points (WAPs) • Installation of 18 new Cat 6 data outlets • Creation of a new power ring main feeding 6 new double sockets • Professional wall-mounting of 4 large TVs • Relocation of 2 existing floor boxes • Concealed connection from each TV to its floor box (1 × HDMI, 1 × USB-C, 1 × Cat 6 data) • Testing and remediation of existing faulty floor-box outlets in one meeting room Pre-Installation: Detailed Wi-Fi Scoping Survey Before any quotation or work commenced, ONS Group carried out a comprehensive on-site Wi-Fi scoping survey. Using professional predictive modelling software and physical heat-mapping tools, we identified optimal access-point locations (AP1–AP4) to deliver blanket coverage across the open-plan areas and meeting rooms, eliminating existing dead zones and ensuring capacity for high-density device usage. This survey formed the foundation of the design and gave the client full confidence that the proposed solution would meet – and exceed – their performance expectations. Scope of Works Delivered All works were completed by ONS Group’s in-house team of data, electrical and AV engineers: • Installed and terminated 18 new Cat 6 U/UTP outlets into existing comms cabinet and new faceplates/backboxes • Mounted and configured 4 new wireless access points in the pre-surveyed optimal locations • Installed a new 32A RCBO-protected ring main with 6 new double switched sockets • Wall-mounted 4 large TVs using heavy-duty brackets • Ran concealed power and data above false ceilings with neat white PVC trunking drops to TV height and down to relocated floor boxes • Relocated 2 floor boxes exactly as requested (one 1 m behind a desk, one directly under a meeting table) • Supplied and installed HDMI, USB-C and Cat 6 fly leads from each TV to its floor box • Tested and repaired 4 existing faulty ports in a meeting-room floor box • Fully labelled, tested and certified every new circuit and data outlet All cabling was routed neatly through existing basket tray and containment wherever possible, maintaining a clean and professional finish. Project Execution • Works carried out over an agreed 5-day period during normal office hours • Zero disruption to daily operations – rooms were handed back each evening in full working order • Full adherence to health & safety and COVID-safe working practices The Result The project was delivered on time and to an exceptionally high standard. Post-installation Wi-Fi testing showed 100% coverage with signal strengths exceeding −65 dBm throughout all areas and seamless roaming between access points “Nevada IT & ONS were an absolute pleasure to deal with from start to finish. The pre-survey gave us total confidence, the installation team were professional, tidy and incredibly considerate of our working environment, and the finished result is flawless. Wi-Fi is now rock-solid everywhere and the meeting rooms look fantastic. We couldn’t be happier – highly recommended!” Why they chose Nevada IT and ONS • Thorough pre-works Wi-Fi scoping survey guaranteeing performance • Single point of responsibility (data, power and AV) • Neat, compliant and future-proof installation • Clear communication and zero surprises Nevada IT with ONS Groups help – delivering technology installations that just work. Contact us today!
bottom of page